Concrete Grinding at Crown Tower Parkade

Crown Tower Parkade, Coquitlam, BC

High rise construction in a city that has high levels of rain can present challenges to concrete contractors. This was the case when Beedie Construction went to pour and place their parkade earlier this year. Provisions were made to protect the slab as much as possible but unfortunately heavy rain made its way into the parkade and 40K SQ FT of concrete now needs to be brought up to specification. Tight timelines required a one step solution that would remove the latency left by the rain and create a CSP 3 surface profile suitable to apply a resin coating.

Titan XT Propane

The WerkMaster Titan XT Propane was chosen because of its high rate of production and ability. The added benefit of not needing any additional power to run the machine made start up time instantaneous. WerkMaster machines feature Octi-Disc™ Technology – 8 direct driven heads that are configured to allow ALL models to get to within 1/8” or 3mm of a wall.

The combination of technology and tooling allowed for effective removal and a CSP3 equivalent profile for bonding new epoxy membrane.